PROJECT: CONSTRUCTION OF 9 ROADS IN IFELODUN TOWNSHIP, OSUN STATE, NIGERIA

PROJECT: CONSTRUCTION OF 37 KM ROADS IN SILAME LG, SOKOTO STATE, NIGERIA

PROJECT: ANKPA/OGODO/AKWU/ACHARANE/EGANE/ALOMA ROAD

Client: Kogi State Ministry of Works

Month Awarded: January 2006

Month of completion: Completed

SPECIAL FEATURES:

Length and Type of road: 54km long

Earth works: 109,955 Cu. M.

Site Clearing: 105,000 Sq. M

Sub-base: 64,680 Cu. M.

Laterite Base: 61,215 Cu. M

Excavate for culvert and side drains: 10,300 Cu. M

900mm dia pipe culvert: 474 lm

600mm precast pipe culvert: 500 lm

Block Drain: 1,200 lm

Concrete Lined drain: 5000 lm

Slabs for concrete lined drain: 5,600 Nos

MC1/MC0: 365,250 Sq. M

Surface Dressing: 365,250 Sq. M

Project location: Kogi State of Nigeria

PROJECT: CONSTRUCTION OF DOMA-AGYARKU, KADARKO-GIZA-KEANA, AGAZA-AGWATASHI ROAD (SECTION 1) DOMA-AGYARKU ROAD

Client: Nassarawa State Ministry of Works

Name of consultant: AR-AR Partnership Consulting Engineers

Month Awarded: 2009

Month of completion: Completed

Length and Type of road: 24km long

Numbers and Types of Bridges: 40m length

SPECIAL FEATURES:

Earth works: 290,721.6 Cu. M.

Site Clearing: 33,600 Sq. M

Laterite Sub-Base/Base: 74,160 Cu. M.

1 x 900mm dia pipe culvert: 108 lm

Reinforced concrete lined drain: 10,000m

Box culvert, 2m x 2m x 2m: 48 lm

Box culvert, 2m x 3m x 3m: 36 lm

Excavate for culverts and drains: 448.98 Cu. M

Block drain filled with concrete grade 15: 2000 lm

MC1/MC0: 247,200 Sq. M

Surface Dressing: 422,400 Sq. M

Tack Coat: 367, 400 Sq. M

KM Post: 24 Nos

Project location: Nassarawa state of Nigeria

PROJECT: CONSTRUCTION OF VOCATIONAL TRAINING CENTRE ROAD AND FEDERAL TECHNICAL SCIENCE SCHOOL ROAD, DOMA, NASSARAWA

Client: Nassarawa State Ministry of Works and Transport

Month Awarded: 14th September, 2009

SPECIAL FEATURES:

Earth works: 7,625 Cu. M.

Site Clearing: 12Ha

Laterite Sub-base/Base: 6,000 Cu. M.

1 x 600mm pipe culvert: 48 lm

Stone Pitching: 1,110 Sq. M Project location: Nassarawa State of Nigeria

PROJECT: GUDI JUNCTION- ANGWAN ZARIA (PHASE 1)

Client: Nassarawa State Ministry of Works and Transport

Name of consultant: AR-AR Partnership Consulting Engineers

Month Awarded: April 2009

Month of completion: Completed

Length and Type of road: 13km long

Numbers and Type of bridges:

2 Nos of span bridge, 15m wide, 30m length
Pad Foundation
Concrete works – 449.5 Cu. M
Reinforcement – 105 Tons SPECIAL FEATURES:

Earth works: 133,207.68 Cu. M.

Site Clearing: 39,000Ha

Laterite Base/Base: 52,416 Cu. M.

900mm dia P.C pipe culvert: 252m

3 x 900mm dia P.C Pipe culvert: 12m

3 x 1200mm dia P.C Pipe culvert: 12m

Reinforced concrete lined drain: 850m

Stone Pitching: 2,890m

MC0: 102, 375.0 Sq. M

Surface Dressing: 203,385 Sq. M

Tack Coat: 367, 400 Sq. M

Project location: Nassarawa State of Nigeria

PROJECT: JANGARI-KUTTU-MUKU ROAD

Client: Jigawa State Roads Construction Programme

Month Awarded: 29th September, 2006

Month of completion: Completed

SPECIAL FEATURES:

Length and Type of road: 30.5km long

Earth works: 310,000 Cu. M.

Site Clearing: 910, 000 Sq. M

Laterite Sub- Base/Base: 101,100 Cu. M

Excavate for culverts and lined drains: 2000 Cu. M

1 x 900mm pipe culvert: 392,000 lm

2 x 900mm pipe culvert: 14 lm

Block Filled Lined Drain: 2000 lm

MC1/MC0: 226,000 Sq. M

Surface Dressing: 452,000 Sq. M

Project location: Jigawa State of Nigeria

PROJECT: MAINTENANCE REPAIRS BY RETAINERSHIP OF JOS-AKWANGA ROAD

Client: Federal Road Maintenance Agency (FERMA)

Month Awarded: 8th October, 2007

Month of completion: Completed

SPECIAL FEATURES: Maintenance / repair works for a period of one year retainership

Project location: Plateau and Nassarawa States of Nigeria

PROJECT: MASSIVE REPAIRS/MAINTENANCE OF THE FEDERAL HIGHWAY NETWORK ACROSS THE COUNTRY/ ALIADE-OTURKPO, ENUGU-UMUAHIA PORT HARCOURT ROAD SECTION G: (OTURKPO-OJU ROAD)

Client: Federal Road Maintenance Agency (FERMA)

Month Awarded: 16th March, 2006

Month of completion: Completed

SPECIAL FEATURES: Maintenance / repair works for a period of one year retainership

Project location: Benue and Enugu States of Nigeria

PROJECT: CONSTRUCTION OF PANYAM-BOKKOS-WAMBA ROAD, SECTION 1

Client: Federal Ministry of Works

Name of consultant: Chief Cornerstone Engineering Consultants

Month Awarded: 25th April, 2007

Month of completion: On-going

Special Features: The road starts on Jos-Mangn-Panyam Federal highway, passing through Bokkos to Daffo town, it is a total of 50km.

Scope of Works:

Length and Type of road: 50km, Asphalted Federal Highway

Numbers and Type of bridges:

3 Nos of 3 span bridge, 15m wide, 45m length

1 No of span bridge, 15m wide, 30m length

3 Nos bridges have foundation on pad footing
        Concrete works – 3, 556 Cu. M
        Reinforcement – 507 TONS

1 No Bridge on pile foundation
        No. of pile – 270m
        Diameter – 1000mm
        Concrete works – 940m3
        Reinforcement – 168Tons

Earth works: 1,235,219 Cu. M.

Site Clearing: 150Ha

Rock Blasting: 30 Cu. M

Sub-base: 158,400 Cu. M.

900mm dia pipe culvert: 975m

Reinforced concrete lined drain: 10,000m

Box culvert: 6 Nos

MC1: 652,400 Sq. M

Stone base: 179,100 tons

Surface Dressing: 275,000 Sq. M

Tack Coat: 367, 400 Sq. M

Asphalt: 89,226tons

Project location: Plateau and Nassarawa States of Nigeria

PROJECT: CONSTRUCTION AND UPGRADING OF OLYMPIC SIZE SWIMMING POOL AT MURTALA MOHAMMED SQUARE, KADUNA

Client: Kaduna State Ministry of Works

Month Awarded: 2008

SPECIAL FEATURES:

Site Clearance: 2, 392 Sq. M

SUB-STRUCTURE

Excavation to remove top soil: 2, 219 Sq. M
Excavation up to 3.00m: 4, 636 Cu. M
Rock Excavation: 1,180 Cu. M
Removal of surplus excavated material: 4,598 Cu. M.
Shuttering: 3,394 Sq. M
Concrete Blinding: 3,148 Sq. M
Plain in-situ concrete: 40 Cu. M
Reinforced in-situ concrete: 268 Cu. M
Reinforced Bars: 127.98 Tons
Formwork: 2,641 Sq. M
Sandcrete: 572 lm
In situ concrete: 4 Cu. M
High tensite bars: 0.870 Tons


STRUCTURAL STEEL WORK

305x 305 x 97kg/lm universal beam: 18.74 tons
450 x 450 x20mm base plate Bolts: 23 Nos

STRUCTURAL STEEL WORK – 23 Nos steel trusses spanning 13,128mm overall, consisting of 60mm x 60mm x 6mm angle rafters and ties, and 50mm x 50mm x 6mm struts welded together to form one unit.

203mm x 203mm x 46kg/lm universal beam – 12.273 Tons
60mm x 60mm x 6mm struts and ties – 1,208 lm
50mm x 50mm x 6mm struts and ties – 56 lm


UNFRAMED WORK

150 x 150 x 2mm thick zed purlin fixed to steel trusses – 1,021 lm
50mm steel tubular to support roof – 90 lm
12mm diameter black bolts – 242 Nos


OTHER ELEMENTS

Element No. 2K – Floor Finishes
Element No. 2L – Ceiling Finishes
Element No. 2M – Fittings and Fixtures
Element No. 3A – Plumbing and mechanical services and installations
Element No. 3B – Electrical installations

EXTERNAL AND INTERNAL WALLS

Sandcrete hollow blocks in cement mortar – 1:6
225mm wall externally – 489 Sq. M
225mm wall internally – 315 Sq. M
150mm wall internally – 247 Sq. M
225mm screen wall – 361 Sq. M


WINDOWS AND DOORS

Composite unit overall size, 160mm x 2900mm consisting of 1 No fixed light 1600mm x 600mm high and double leaf entrance swing door size 1600mm x 2100mm coupled together to form one unit – 2 Nos

Door Size: 900 x 2100mm – 15 Nos
Ditto: 1000 x 2100mm – 4 Nos
Composite window 3000mm x 1500mm divided into 3 Nos vertical units each, size 1000mm x 2100mm high made up of 3Nos openable projected windows, 3Nos fixed light each size 1000mm x 600mm coupled together to form one unit – 11Nos

Window size 1200mm x 1200mm x 1200mm – 3Nos
Window size 1200mm x 1200mm x 900mm – 2Nos
Window size 1000mm x 900mm – 2Nos
Framed screen view size 3600 x 900mm – 1 No


Project location: Kaduna State of Nigeria

PROJECT: REHABILITATION OF IGEDE-AWO-IDO ROAD PROJECT (24 KM), EKITI STATE, NIGERIA

Client: Ekiti State Ministry of Works and Transport, Ado-Ekiti, Ekiti State, Nigeria

Month Awarded: December 2011

SPECIAL FEATURES:

Special Project Features: Asphalt Overlay of Existing 24 KM Road with Heavy Traffic in Urban Area.

i) Asphalt Wearing Course: 175,200 m2

ii) Stone Base: 3500m3

iii) Reinforced Concrete Line Drain: 4000 meters

iv) Pipe Culverts: 280 meters

v) Concrete in Box Culverts: 300m3

vi) Earthworks for Shoulders: 20,000 m3

vii) Filter Material in Marshy Areas: 3020m3

viii) Excavate Unsuitable Materials: 6250 m3

ix) Scarify Failed Sections: 21,700m2

x) Laterite Sub-Base: 6300 m3

xi) Surface Dressing Shoulders: 42,000m2

xii) MC1 Priming: 93,500 m2

Project location: Igede-Ekiti to Ido-Ekiti, Ekiti State, Nigeria

PROJECT: CONSTRUCTION OF LAPAI GWARI FUT PERMANENT SITE ROAD & BARAGO RIVER BRIDGE, NIGER STATE, NIGERIA.

Client: Ministry of Works and Infrastructure, Minna, Niger State, Nigeria

Month Awarded: February 2012

SPECIAL FEATURES :

Bridge Features: 3 Span Bridge with 20 Meter Precast Concrete Beams, and 1200 Bore Piles.

i) Bore Piles 1200mm: 495 meters

ii) Precast Concrete Beams 20 M Length: 365m3 Concrete

iii) Earthworks Fill: 300,000m3 Laterite

iv) Grade 30 Concrete in Bridges: 1000m3

v) Stone Pitching: 5000 m2

vi) Concrete Line Drain: 3000meters

viii) Precast Concrete Cover Slabs: 500 pcs

viii) Excavate Unsuitable Materials: 6250 m3

ix) Excavation: 40,000m3

x) High Tensile Reinforcement: 600 Tons

xi) Site Clearance: 300,000 m2

xii) Stone Base: 15,000m3

xiii) Surface Dressing: 94,000 m2

xiv) Concrete Kerbs: 4000 meters 3

xiv) Concrete Kerbs: 4000 meters 3

Project location: Minna, Niger State, Nigeria