PROJECT: ANKPA/OGODO/AKWU/ACHARANE/EGANE/ALOMA ROAD
Client: Kogi State Ministry of Works
Month Awarded: January 2006
Month of completion: Completed
SPECIAL FEATURES:
Length and Type of road: 54km long
Earth works: 109,955 Cu. M.
Site Clearing: 105,000 Sq. M
Sub-base: 64,680 Cu. M.
Laterite Base: 61,215 Cu. M
Excavate for culvert and side drains: 10,300 Cu. M
900mm dia pipe culvert: 474 lm
600mm precast pipe culvert: 500 lm
Block Drain: 1,200 lm
Concrete Lined drain: 5000 lm
Slabs for concrete lined drain: 5,600 Nos
MC1/MC0: 365,250 Sq. M
Surface Dressing: 365,250 Sq. M
Project location: Kogi State of Nigeria
PROJECT: CONSTRUCTION OF DOMA-AGYARKU, KADARKO-GIZA-KEANA, AGAZA-AGWATASHI ROAD (SECTION 1) DOMA-AGYARKU ROAD
Client: Nassarawa State Ministry of Works
Name of consultant: AR-AR Partnership Consulting Engineers
Month Awarded: 2009
Month of completion: On-going
Length and Type of road: 24km long
Numbers and Types of Bridges: 40m length
SPECIAL FEATURES:
Earth works: 290,721.6 Cu. M.
Site Clearing: 33,600 Sq. M
Laterite Sub-Base/Base: 74,160 Cu. M.
1 x 900mm dia pipe culvert: 108 lm
Reinforced concrete lined drain: 10,000m
Box culvert, 2m x 2m x 2m: 48 lm
Box culvert, 2m x 3m x 3m: 36 lm
Excavate for culverts and drains: 448.98 Cu. M
Block drain filled with concrete grade 15: 2000 lm
MC1/MC0: 247,200 Sq. M
Surface Dressing: 422,400 Sq. M
Tack Coat: 367, 400 Sq. M
KM Post: 24 Nos
Project location: Nassarawa state of Nigeria
PROJECT: CONSTRUCTION OF VOCATIONAL TRAINING CENTRE ROAD AND FEDERAL TECHNICAL SCIENCE SCHOOL ROAD, DOMA, NASSARAWA
Client: Nassarawa State Ministry of Works and Transport
Month Awarded: 14th September, 2009
SPECIAL FEATURES:
Earth works: 7,625 Cu. M.
Site Clearing: 12Ha
Laterite Sub-base/Base: 6,000 Cu. M.
1 x 600mm pipe culvert: 48 lm
Stone Pitching: 1,110 Sq. M
Project location: Nassarawa State of Nigeria
PROJECT: GUDI JUNCTION- ANGWAN ZARIA (PHASE 1)
Client: Nassarawa State Ministry of Works and Transport
Name of consultant: AR-AR Partnership Consulting Engineers
Month Awarded: April 2009
Month of completion: On-going
Length and Type of road: 13km long
Numbers and Type of bridges:
2 Nos of span bridge, 15m wide, 30m length
Pad Foundation
Concrete works – 449.5 Cu. M
Reinforcement – 105 Tons
SPECIAL FEATURES:
Earth works: 133,207.68 Cu. M.
Site Clearing: 39,000Ha
Laterite Base/Base: 52,416 Cu. M.
900mm dia P.C pipe culvert: 252m
3 x 900mm dia P.C Pipe culvert: 12m
3 x 1200mm dia P.C Pipe culvert: 12m
Reinforced concrete lined drain: 850m
Stone Pitching: 2,890m
MC0: 102, 375.0 Sq. M
Surface Dressing: 203,385 Sq. M
Tack Coat: 367, 400 Sq. M
Project location: Nassarawa State of Nigeria
PROJECT: JANGARI-KUTTU-MUKU ROAD
Client: Jigawa State Roads Construction Programme
Month Awarded: 29th September, 2006
Month of completion: Completed
SPECIAL FEATURES:
Length and Type of road: 30.5km long
Earth works: 310,000 Cu. M.
Site Clearing: 910, 000 Sq. M
Laterite Sub- Base/Base: 101,100 Cu. M
Excavate for culverts and lined drains: 2000 Cu. M
1 x 900mm pipe culvert: 392,000 lm
2 x 900mm pipe culvert: 14 lm
Block Filled Lined Drain: 2000 lm
MC1/MC0: 226,000 Sq. M
Surface Dressing: 452,000 Sq. M
Project location: Jigawa State of Nigeria
PROJECT: MAINTENANCE REPAIRS BY RETAINERSHIP OF JOS-AKWANGA ROAD
Client: Federal Road Maintenance Agency (FERMA)
Month Awarded: 8th October, 2007
Month of completion: Completed
SPECIAL FEATURES:
Maintenance / repair works for a period of one year retainership
Project location: Plateau and Nassarawa States of Nigeria
PROJECT: MASSIVE REPAIRS/MAINTENANCE OF THE FEDERAL HIGHWAY NETWORK ACROSS THE COUNTRY/ ALIADE-OTURKPO, ENUGU-UMUAHIA PORT HARCOURT ROAD SECTION G: (OTURKPO-OJU ROAD)
Client: Federal Road Maintenance Agency (FERMA)
Month Awarded: 16th March, 2006
Month of completion: Completed
SPECIAL FEATURES:
Maintenance / repair works for a period of one year retainership
Project location: Benue and Enugu States of Nigeria
PROJECT: CONSTRUCTION OF PANYAM-BOKKOS-WAMBA ROAD, SECTION 1
Client: Federal Ministry of Works
Name of consultant: Chief Cornerstone Engineering Consultants
Month Awarded: 25th April, 2007
Month of completion: On-going
Special Features: The road starts on Jos-Mangn-Panyam Federal highway, passing through Bokkos to Daffo town, it is a total of 50km.
Scope of Works:
Length and Type of road: 50km, Asphalted Federal Highway
Numbers and Type of bridges:
3 Nos of 3 span bridge, 15m wide, 45m length
1 No of span bridge, 15m wide, 30m length
3 Nos bridges have foundation on pad footing
Concrete works – 3, 556 Cu. M
Reinforcement – 507 TONS
1 No Bridge on pile foundation
No. of pile – 270m
Diameter – 1000mm
Concrete works – 940m3
Reinforcement – 168Tons
Earth works: 1,235,219 Cu. M.
Site Clearing: 150Ha
Rock Blasting: 30 Cu. M
Sub-base: 158,400 Cu. M.
900mm dia pipe culvert: 975m
Reinforced concrete lined drain: 10,000m
Box culvert: 6 Nos
MC1: 652,400 Sq. M
Stone base: 179,100 tons
Surface Dressing: 275,000 Sq. M
Tack Coat: 367, 400 Sq. M
Asphalt: 89,226tons
Project location: Plateau and Nassarawa States of Nigeria
PROJECT: CONSTRUCTION AND UPGRADING OF OLYMPIC SIZE SWIMMING POOL AT MURTALA MOHAMMED SQUARE, KADUNA
Client: Kaduna State Ministry of Works
Month Awarded: 2008
SPECIAL FEATURES:
Site Clearance: 2, 392 Sq. M
SUB-STRUCTURE
Excavation to remove top soil: 2, 219 Sq. M
Excavation up to 3.00m: 4, 636 Cu. M
Rock Excavation: 1,180 Cu. M
Removal of surplus excavated material: 4,598 Cu. M.
Shuttering: 3,394 Sq. M
Concrete Blinding: 3,148 Sq. M
Plain in-situ concrete: 40 Cu. M
Reinforced in-situ concrete: 268 Cu. M
Reinforced Bars: 127.98 Tons
Formwork: 2,641 Sq. M
Sandcrete: 572 lm
In situ concrete: 4 Cu. M
High tensite bars: 0.870 Tons
STRUCTURAL STEEL WORK
305x 305 x 97kg/lm universal beam: 18.74 tons
450 x 450 x20mm base plate Bolts: 23 Nos
STRUCTURAL STEEL WORK – 23 Nos steel trusses spanning 13,128mm overall, consisting of 60mm x 60mm x 6mm angle rafters and ties, and 50mm x 50mm x 6mm struts welded together to form one unit.
203mm x 203mm x 46kg/lm universal beam – 12.273 Tons
60mm x 60mm x 6mm struts and ties – 1,208 lm
50mm x 50mm x 6mm struts and ties – 56 lm
UNFRAMED WORK
150 x 150 x 2mm thick zed purlin fixed to steel trusses – 1,021 lm
50mm steel tubular to support roof – 90 lm
12mm diameter black bolts – 242 Nos
OTHER ELEMENTS
Element No. 2K – Floor Finishes
Element No. 2L – Ceiling Finishes
Element No. 2M – Fittings and Fixtures
Element No. 3A – Plumbing and mechanical services and installations
Element No. 3B – Electrical installations
EXTERNAL AND INTERNAL WALLS
Sandcrete hollow blocks in cement mortar – 1:6
225mm wall externally – 489 Sq. M
225mm wall internally – 315 Sq. M
150mm wall internally – 247 Sq. M
225mm screen wall – 361 Sq. M
WINDOWS AND DOORS
Composite unit overall size, 160mm x 2900mm consisting of 1 No fixed light 1600mm x 600mm high and double leaf entrance swing door size 1600mm x 2100mm coupled together to form one unit – 2 Nos
Door Size: 900 x 2100mm – 15 Nos
Ditto: 1000 x 2100mm – 4 Nos
Composite window 3000mm x 1500mm divided into 3 Nos vertical units each, size 1000mm x 2100mm high made up of 3Nos openable projected windows, 3Nos fixed light each size 1000mm x 600mm coupled together to form one unit – 11Nos
Window size 1200mm x 1200mm x 1200mm – 3Nos
Window size 1200mm x 1200mm x 900mm – 2Nos
Window size 1000mm x 900mm – 2Nos
Framed screen view size 3600 x 900mm – 1 No
Project location: Kaduna State of Nigeria